Machinery Annex IV technical file template
Structured to Annex IV Part A, with the partly completed machinery variant included.
€149 · DOCX, XLSX and a PDF guide
Releasing soon — join the list below for launch pricing
What is inside
- Annex IV Part A master document (DOCX) — every required section in order, with guidance notes on the level of detail each one needs.
- Annex IV Part B variant — for partly completed machinery, structured around which essential requirements have been applied and fulfilled.
- Annex III requirement-to-evidence index (XLSX) — every applicable essential health and safety requirement as a row, with evidence, owner, status and not-applicable justification.
- Hazard register — keyed to lifecycle phases including installation, setting, cleaning, maintenance and decommissioning, which is where incomplete assessments usually fail.
- Digital and cybersecurity annex — the new Regulation requirements on corruption of safety-related software and data, with the questions to answer and where the answers go.
- Annex V declarations — declaration of conformity and declaration of incorporation, both with the Union-established person field explained.
- Standards register — dated references mapped to the hazards and requirements each one addresses.
- Citation migration checklist — every place a 2006/42/EC reference has to become a 2023/1230 reference before 20 January 2027.
Who it is for
Machinery manufacturers, integrators and importers preparing for 20 January 2027, and anyone who has discovered that a retrofit made them the manufacturer of modified machinery.
What it does not do
Licence
One organisation, unlimited internal use, unlimited products, perpetual, adaptable. No resale, redistribution or publication; no use to produce documentation as a service for third parties without a consultancy licence. Full terms →
Format and delivery
DOCX, XLSX and a PDF guide. Delivered as an immediate download link after payment, with a second copy by email. No account to create, no login, nothing to install. Updates for twelve months are included and are sent to the email address used at purchase.
Get told when the requirements change
None of the 35 CRA harmonised standards is published yet. When they land — and when deadlines move — we email you. No more than twice a month.